Thursday, June 19, 2008

Continuation of Tetreault Project










Here's a quick up date to the project we are currently doing. The cieling was in pretty rough shape.




Instead of replacing it we decided to glue and screw strapping to the existing framing under the old cieling, then glue and screw up some 1/2 inch birch plywood.




Along all the edges and covering the seams I glued and nailed some 1x4 to give it a pictire frame look. The wife of the house hold said it looked beautiful. That makes my day! Take alook for your self.

Tuesday, June 17, 2008

Tetreault Project


We have had the oportunity to right some wrongs on this job!
After completing the roof, we were tasked to do something with the front porch.
The job was completed but 100% satisfaction was not reached. The lumber we used twisted and shrunk so bad that it was noticable when you looked from the street!
This is our current job so stay tunes for more details!